How We Work

The Coordination Model

How every deal, document, milestone, and stakeholder moves through the RDS tenant-coordination workflow — one dashboard of truth from lease execution to Grand Opening.

6
Core Entities
Property to LLW, all linked
5
Deal Status Categories
DVP Approved · Executed · Open · Renewal · TC-Only
9
Milestone Gates
From FPE through RCD / FCD
The Operating Model

From lease execution to Grand Opening

Every tenant space passes through a repeatable sequence of documents, approvals, milestones, and stakeholder hand-offs — tracked end-to-end in one unified model.

01

Entities

Property, Deal, Space, Tenant, Contact, Document, Milestone, and LLW records — all linked, all queryable.

02

Documents

Lease drafts, plan submittals, sign drawings, permits, and T&M tickets — each with its own lifecycle and approval trail.

03

Contacts

Every party — Tenant Coordinator, Leasing Agent, Attorney, TArch, TGC, Landlord PM — with role, responsibility, and reach-out log.

04

Milestones

FPE, EDD, Space Delivered, ECS, POD, RCD/FCD — each gated by documents and enforced by red-flag rules.

A single source of truth

Every space, every stage, every day — no more spreadsheet roulette.

Real-time deal status

Red-flag rules escalate FPE, ECS, and RCD risks the moment they slip.

Milestone accountability

Planned vs. actual on every gate, escalated to the responsible party.

Document traceability

Every draft, revision, and approval timestamped to the person and the deal.

Contact intelligence

Every reach-out, response, and next follow-up logged against the deal.

The Data Model

Core entities, one coordinated deal

Every tracked item ties back to a Deal, so a coordinator can pivot from a milestone slip to the responsible contact, the outstanding document, and the impacted tenant in one click.

Property

Mall / Center · Portfolio

Space

Unit # · GLA · Status · Existing Lease

Deal

Unit · SQ FT · Purpose · Status · Milestone

Central Record

Tenant

DBA · Legal Entity · Account

Contact

Person · Role · Party · Reach-out log

Document

Lease · Plans · Sign Dwgs · Permits

Milestone

FPE · EDD · ECS · POD · RCD/FCD

LLW

Landlord Work · Scope · $ · Sign-off

End-to-End Workflow

Five phases, every hand-off

The stages every deal moves through — and the key documents produced along the way.

01

Deal Setup

DVP approval & deal terms
Deal created in platform
Documents
Deal SheetSSLE
02

Lease Execution

Draft lease circulated
Lease executed (FEX)
Status: Executed / Not Open
Documents
Lease DraftFully Executed Lease
03

Design & Permitting

Prelim plans submitted
TC plan review / AAN issued
Final plans + permit
Documents
Prelim & Final PlansAAN LetterSign DwgsPermit
04

Delivery & Construction

Space delivered (LL turnover)
Construction start (ECS)
Site visits + LLW sign-off
Punch list + inspection
Documents
LLW Sign-offT&M TicketsSite-visit Reports
05

Grand Opening

POD confirmed
RCD / FCD set
Grand opening logistics
Documents
COPOD LetterPunch ListRCD/FCD Letter
Document Lifecycle

Every document, the same six-stage backbone

Whether it is a lease, a set of plans, or a sign drawing — every tracked document flows through the same states, timestamped at each transition so bottlenecks are visible immediately.

01

Requested

TC requests document from tenant / architect.

02

Draft Sent

Party submits the initial draft.

03

Under Review

TC + landlord ops review and mark up.

04

Returned

Comments issued: MIR, RES, or AAN.

05

Revised

Party resubmits; review repeats if needed.

06

Approved

AAN / FEX / Approved. Document locked & filed.

Approval Status Codes

AANApproved As Noted
MIRMore Information Required
RESResubmit / Not Approved
FEXFully Executed (leases)
ASTApproved Subject To
PACPAF Approval Completed

Tracked Document Types

Lease Stream
  • Deal Sheet / SSLE
  • Lease Draft (v1..vn)
  • Redline / Comments
  • Fully Executed Lease (FEX)
  • Amendments / Riders
Design Stream
  • Prelim Plans
  • Final Plans
  • Sign Drawings
  • Storefront Elevation
  • MEP / Fire Life-Safety Plans
Approval Stream
  • AAN / MIR / RES letters
  • Permit Application
  • Issued Permit
  • Certificate of Occupancy
  • Health-Dept Sign-off
Construction Stream
  • LLW Scope Sheet
  • T&M / COR Tickets
  • Site-Visit Reports
  • Punch List
  • POD / RCD-FCD Letter
Contact Model & Responsibility

Who does what, on every deal

Every contact carries a role and a party. Every activity has a Responsible, Accountable, Consulted, and Informed party — configurable per property and per deal type.

Contact Roster

Landlord / RDS
Tenant Coordinator (RDS)Dockmaster (RDS)Landlord PMGeneral Manager
Leasing & Legal
Leasing AgentAttorney / Paralegal
Tenant
Tenant PMTenant Real Estate RepTenant Construction Mgr
Tenant Vendors
Tenant Architect (TArch)Tenant General Contractor (TGC)Sign Fabricator / Vendor

Responsibility Matrix (default RACI)

ActivityTC · RDSLeasingAttorneyTenant PMTArchTGCLL Ops
Draft & negotiate leaseCRAII
Track deal status & milestonesRIIIIIA
Submit prelim / final plansCIARII
Issue AAN / MIR / RESRIICA
Permit applicationCARCI
Deliver space to tenantAIIR
Landlord Work (LLW)AIICR
Sign drawing approvalAICRI
Site visits & punch listACIRC
Confirm POD / RCD-FCDRIAII
Grand opening logisticsRIACI
R ResponsibleA AccountableC ConsultedI Informed
Milestone Timeline & Risk Rules

Nine gates, one countdown to Grand Opening

Each milestone is a planned-vs-actual date on the deal. Red-flag rules fire automatically when a gate slips past its risk threshold, escalating to the responsible party.

FPE
Final Plans Expected
FPR
Final Plans Received
APPR
Plans Approved (AAN)
EDD
Estimated Delivery Date
SD
Space Delivered
ECS
Expected Const. Start
CS
Construction Started
POD
Projected Open Date
RCD/FCD
Rent Commencement / FCD

Auto-Escalation Rules

FPE missing / past due within 180 days
ECS missing / past due within 120 days
Plans in MIR or RES over 15 days
RCD/FCD within 180 days (New / Relo / Exp)
Remodels within 120 days of required date
Existing lease end within 30 days of report run

Escalation Ladder

Day 0TC logs flag; auto-email to responsible party
Day 3TC direct call; comment logged on deal
Day 7Escalate to Landlord PM + Leasing Agent
Day 14Executive summary to client (GM / owner)
Day 21Deal Action Code updated (Priority RCD, etc.)
Data Dictionary

The fields captured on every deal

A field-level view of what the platform stores — every field maps directly to standard lease-management reporting so existing reports can be reproduced natively.

Deal & Space

12 fields
  • Deal DBA / Target DBA
  • Deal Unit / Existing Lease Unit
  • Deal SQ FT
  • Deal Purpose (New/Reloc/Exp/Renew)
  • Deal Status Category
  • Current Milestone + Date
  • Remodel Required Date
  • Unit Status (V/VT/VO/O/N/C)
  • Existing Lease DBA + End Date
  • Buildout Period (days)
  • Permitting Days
  • Deal Action Code

Documents

11 fields
  • Final Plans Expected (FPE)
  • Final Plans Received (FPR)
  • Approval Status (AAN/MIR/RES/AST)
  • Sign Drawing Received
  • Sign Drawing Returned + Approved
  • Lease Draft Version
  • Fully Executed Lease (FEX)
  • Permit Application #
  • Permit Issue Date
  • Certificate of Occupancy
  • Health Dept Sign-off

Milestones

9 fields
  • Estimated Delivery Date (EDD)
  • Space Delivered Date
  • Expected Construction Start (ECS)
  • Construction Started
  • Projected Open Date (POD)
  • RCD / FCD Indicator (R / F)
  • RCD / FCD Date
  • Grand Opening Date
  • Days to Grand Opening (calc.)

LLW & Contacts

10 fields
  • LLW Y/N
  • LLW $ In Deal
  • LLW Scope
  • LLW Sign-off Date
  • Leasing Agent
  • Attorney / Paralegal
  • Tenant Coordinator (TC)
  • Tenant PM, TArch, TGC
  • Comments / Reach-out Log
  • Last & Next Follow-up Dates
Deployment & Next Steps

From kick-off to a live dashboard

Standard RDS onboarding runs four to six weeks from kick-off to a live coordinator dashboard.

1Week 1

Discovery

Confirm property scope, deal inventory, and existing reporting formats.

2Week 2

Data Model Setup

Load properties, deals, contacts, and historical documents into the platform.

3Week 3

Workflow Tailoring

Configure red-flag rules, escalation ladder, and RACI for the coordination team.

4Week 4

Dry-Run & Training

Coordinators run in parallel with existing tools and review dashboard views.

5Week 5–6

Go-Live

Platform becomes system of record. RDS begins weekly status calls.

What You Receive

Live coordinator dashboard (role-based access)
Weekly Document Status by TC report
Monthly executive summary (PDF)
Milestone risk dashboard (live)
Grand Opening readiness scorecard
Historical document archive per deal

Bring your next center online

A coordination platform built by operators with twenty-nine years of precision — tenant coordination, Dockmaster services, and grand opening logistics for regional shopping centers.

Let's Build Together

Ready to start your
next project?

Let our team of experienced professionals bring your retail development to life with proven results and innovative solutions.